Friday, November 9, 2012

Footpegs and bulkhead building



The pegs were installed using a mesh plate/bolt embedded in epoxy.  The bulkhead template was made referencing the nearest station and adding cardboard tabs to get the exact inside shape.

No comments:

Post a Comment